Technical Rider
On this page you find the technical details of the performance. There is a full-on version and a light version for the lights. Some adjustments can be made. So, do contact us with further questions.
SOUND
PA system |
---|
4 MONITORS | |
---|---|
Aux 1 | monitor percussion |
Aux 2 | monitor tar / setar |
Aux 3 | sidefill stage right (Jardin) |
Aux 4 | sidefill stage left (Cour) |
INPUT | WHAT | MIC |
---|---|---|
1 | Looper percussion left | D.I. |
2 | Looper percussion right | D.I. |
3 | Vocal percussion | SM 58 |
4 | Vocal Tar / Setar | SM 58 |
5 | Vocal Tar / Setar | SM 58 |
6 | Vocal presentation | SM 58 |
7 | Vocal presentation | SM 58 |
8 | Video screen/drum stage right | Km 184 / Neurmann 184 + clip or tape |
9 | Video screen/drum stage left | Km 184 / Neurmann 184 + clip or tape |
10 | Video screen/drum | C411 (own) |
SOUND MATERIAL | |
---|---|
4 | micro stands |
2 | XRL cables (output mixing desk) |
4 | small reading lamps (3 for the musicians and 1 for the video-artist) |
LIGHT - original version
ESSENTIALS | |
---|---|
1 | Elation OPTI QA Par behind the drum (provided by the company) |
4 | wash vanuit de hoeken van de dansvloer (in de trussen) |
1 | 1x spot above begin position Maya |
4-8 | vloerpar met shutter/strobe effect |
'rain down' effect with small beams |
Download the Light Plot here.
LIGHT - light version
- 8 ADB pc 1 Kw
- 4 ADB DS profiel 1 KW
- 19 PAR CP 60
- Lee filter: 9 PAR formaat: cyaan 115/116, 8 PC formaat: 201 en 204
- Voldoende bekabeling, dimmers en stroompunten om alles aan te sluiten.
- Chamsys (MQ 50 / 70)
- Indien mogelijk: 4 x moving head wash en 4 x moving head spot (Chauvet of Robe)
- Ladder/hoogtewerker
- POWERCON KABEL + VERLENGKABEL EN STEKKERDOOS VOOR SCHADUWSCENE
Download the Light Plot here.
STAGE
Blackout & Light Control |
---|
The performance relies on precise light and video effects created by the video artist. Therefore, the venue must be able to achieve complete blackout. The method of achieving this can be discussed and adapted based on the venue’s possibilities.
REQUIREMENTS FOR VIDEO-ARTIST |
---|
- small table for placement of camera |
- small table for placement of beamer |
- Projector (provided by the company) placed right in from and in the middle of the stage |
FLOOR REQUIREMENTS FOR THE DANCE |
---|
The ideal option is a professional dance floor. However, if this is not available, the floor must meet the following conditions to ensure the safety and comfort of the performers: |
* It should be smooth, even, and clean. |
* The surface must be free of splinters or rough areas that could cause injuries. |
* If the stage consists of separate elements, they must be securely attached to prevent any movement during the performance. |
If you have any questions or need further clarification, please don’t hesitate to reach out. |
DRUM
ORIGINAL SIZE | DRUM FOR SMALLER PLACES |
---|---|
Diameter: 4m23 | Diameter: 3m75 |
Below is the list of materials needed to build the drum. Apart from the ladder, we can bring everything ourselves. However, as this adds extra weight and luggage, we would prefer if the organiser could provide these materials. If this is not possible, please let us know in advance so we can arrange an alternative solution. |
---|
SUPPLIES FOR DRUM SETTUP | |
---|---|
2 | allen wrench nr. 8 (inbussleutel) |
2 | screw spanner nr. 7 (Engelse sleutel) |
2 | screw spanner nr. 10 (Engelse sleutel) |
2 | big, flat screw driver (schroevendraaier) |
2 | rubber hammer (rubberen hamer) |
mininum 2 | heavy blocks to stabalise the drum |
depending on floor | cloths to protect floor |
1 or 2 | ladder (only for the original size) |
4 | volunteers for drum setup, especially to |
1 | metal drill (metaalboor) - good to have in case of problem |
BACKSTAGE
TIMING | |
---|---|
Drum setup | +- 2 hours |
Drum dismantling | +- 45 minutes |
Duration Performance | 50 minutes |
Duration Talk | 30 minutes |
PARKING |
---|
Kindly provide parking for 4 cars. |
TIMING (Example) |
---|
09u00: Volunteers arrive and start building the drum |
10u00: Arrival artists |
11u00: Light set up combo show |
12u-13u: Lunch for the crew |
13u00: soundcheck n0qté |
14u00: light + video set-up n0qté |
16u30: technical runthrough |
17u00: runthrough |
18u00: Dinner for the crew |
19u15: stage check |
20u00: Performance n0qté |
21u00: Combo performance |
21u20: talk (artists & audience) |
BACKSTAGE |
---|
Kindly provide a warm and clean backstage for 5 artists, 1 technician and the volunteers. |
The backstage needs to be provided with tables, chairs, a mirror, sufficient light and a clean floor to be able to warm up. |
Kindly provide water, drinks and snacks for the artists. |
Kindly provide an ironing board and an iron if possible. |
CONTACT
Production | Maya Sapera | +32 485 938 101 | mayasapera.dans@gmail.com |
Technical questions | Aaron Benoit | +32 495 71 12 10 | Aaron.benoit89@gmail.com |
Maak jouw eigen website met JouwWeb